Major Customers
- JEMENA
- APA GROUP
- SP AUSNET
- HATCH
- MACONNELL DOWELL
- ALCOA
- ALSTOM
- UGL
- GE
- BHP BILLITON
- SIEMENS
- ERM POWER
- BOEING
- SNC LAVALIN
- BP SOLAR
- COMDAIN INFRASTRUCTURE
- WORLEY PARSONS
- CLARKE ENERGY
Previous Projects
-
Bendigo and Ballarat Gas Heaters
As part of the expansion of Ausnet Services gas network, two new Boiler and Heat Exchanger systems will be installed in Bendigo and Ballarat.
The systems are designed and supplied by FEGAS to Tenix.
-
Corio City Gate 2013
FEGAS has been awarded a contract to supply a Natural Gas Heating system for the new Corio City Gate. The City Gate is on SP Ausnet distribution network and will improve the reliability of gas supply to the area. The contract is for the design, manufacturing and supply of a 960 Kw heating system, used to mitigate the JT effect across the city gate`s pressure regulators.
-
Melton City Gate 2013
Melton has been one of the fastest growing suburbs in Melbourne. The new Melton city gate, on SPAusnet network is designed to guarantee gas supply his residents and businesses. FEGAS designed, fabricated and commissioned a high efficiency heating system, which was able to reduce the overall installation footprint.
-
Fyshwick TRS Upgrade 2012
Fyshwick Trunk Receiving station upgrade is one of the major gas projects in ACT region, to secure gas supply in one of the fastest growing market in Australia. FEGAS supplied a 1,5 MW heating system with 100% redundancy, which heats Natural Gas to compensate the JT effect at the reducing station. The heating system avoids icing and hydrates formation and meet contractual temperature requirement for gas supply.
-
Lilydale City Gate 2012
Lilydale City Gate was built to meet rapidly growing demand for Natural Gas in Lilydale and locations across the Dandenong Ranges. FEGAS supplied a heating system to meet design conditions and strict limitation in terms of noise and environmental impact. To achieve these requirements FEGAS proposed a boiler and heat exchanger system, designed for actual demand and ready for future expansion.
-
Owens- Illinois
For Owens- Illinois Factories in Sydney and Brisbane we supplied our Gas safety and control rig for glass furnace complete with PILZ PSS safety PLC burner management system, fully integrated with O-I process control system.
The valve train was manufactured, assembled, wired and tested in our factory in Melbourne, as well as the Control panel.